Taylor Hicks

Project manual divisions

 

 

PROJECT MANUAL DIVISIONS >> DOWNLOAD LINK

 


PROJECT MANUAL DIVISIONS >> READ ONLINE

 

 

 

 

 

 

 

 











 

 

Division 2 Site Work - Existing Conditions manager to establish a schedule to be included in the project manual. 1.9. Maintenance of Services and Access: Due to the fact that university research projects are often conducted over many years, it is critical that demolition during remodeling projects does not interrupt the Nevada Department of Transportation Project Management Division 1263 S. Stewart Street Carson City, NV 89712 Free viewers are required for some of the attached documents. They can be downloaded by clicking on the icons below. Acrobat Reader Windows Media Player Word Viewer Excel Viewer PowerPoint Viewer The divisions and subgroups are as follows: PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP 00 Procurement and Contracting Requirements SPECIFICATIONS GROUP General Requirements Subgroup 01 General Requirements Facility Construction Subgroup 02 Existing Conditions 03 Concrete 04 Masonry 05 Metals 06 Wood, Plastics, and Composites The Project Manual: As noted above, the Project Manual tells your project's story in words. The place to begin is the Table of Contents - excerpts from one are included at the end of this article. Divisions 02 to 48 of the Project Manuals (not all divisions are in all books) lay out the requirements that apply to your subs on the The contents of the Project Manual may be bound in one or more volumes. AIA standard documents include definitions of the above terms very similar to EJCDC's (see AIA ® A101 TM, AIA ® A201 TM, and AIA ® A701 TM). However, AIA documents indicate what constitutes the "Contract Documents" in both the Agreement and in the General Division 01 - General Requirements Subgroup Updated within or after . Enter "-1 year" or "-6 months" or any past date to narrow standards updated since then. 010000S04 Medical Center Project Manual for CM at Risk. 9/2021. MedCen/Hosp only. PDF. Doc/Dwg. 010000S05 Confined Space Entry. 12/2015. MedCen/Hosp only. PDF. Doc/Dwg. 010000S06 Colorado General Conditions of the Contract will precede Division 1 in the project manual. An updated copy can be obtained from the University Representative. B. Contractor shall obtain and comply with current Poudre Fire Authority requirements for temporary heat. Temporary heat set ups shall be inspected by PFA. The contents of this manual can be applied to the majority of the projects a designer will encounter. It is understood that no two projects are the same and that it is impossible to provide information for every circumstance that may be encountered. There will be those projects, or portions of projects, that do not fit the standard applications. Insert a brief description of Project indicating the size, code classification for occupancy and construction type, and general description of major building assemblies >. B. Type of Contract: 1. Project will be constructed under a single prime contract. 2. Project will be constructed under coordinated, multiple To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. University of South Florida MDC Building Reroof Project April 20, 2017 DIVISION 02 SITEWORK Section 02060 SELECTIVE DEMOLITION DIVISION 03 CONCRETE NO WORK IN THIS SECTION DIVISION 04 MASONRY NO WORK IN THIS SECTION DIVISION 05 METALS Section 05310 STEEL DECK Section 05400 COLD FORMED METAL FRAMING PROJECT MANUAL TECHNICAL SPECIFICATIONS AGRICULTURAL

Comment

You need to be a member of Taylor Hicks to add comments!

Join Taylor Hicks

About

Taylor Hicks created this Ning Network.

© 2024   Created by Taylor Hicks.   Powered by

Badges  |  Report an Issue  |  Terms of Service